Testimonial

Brock Commons - World’s Tallest Mass Timber Skyscraper - Vancouver BC

“I want to thank you for the service you and the Preston [Rentals] team provided for the Brock Commons TALL WOOD project.

When a construction team is presented with a project that involves “firsts” it can be very challenging to predict what will be needed to meet the execution requirements. In the case of the Brock Commons project, the world’s tallest Mass Timber building, there were restrictions with respect to existing construction fire codes that allowed only 4 levels of exposed wood before the design fire rating was in place. For Brock Commons the fire rating encapsulation consists of 3-4 layers of ½” sheetrock installed directly to the wooden structure.

... The problem we anticipated having was maintaining the 4 level un-encapsulated requirement at a rate of a floor every 3 days. We needed a way to get all of the sheetrock necessary to complete the encapsulation in order to continue with the structure...

The solution – Preston Superdeck. A complete system of shoring and retractable decks that facilitates stacking multiple thrust out platforms in a common location and every one of them is useable. The system is very well designed. The decks roll easily within a channel, positional lock out is by a very simple sliding bolt, a built in drop down ramp for karts and the decks are completely safe with solid metal fencing. The Preston Superdeck has a very high load rating that allows large single loads. And the fact that all of the decks are in the same location in relationship to the tailgate off-loading location, the operation can be completed quickly by the crane team. Mass material movement from floor to floor can also be accomplished quickly and safely.

We originally ordered 6 Preston Superdecks just before the wooden structural phase began and quickly increased that to 9 decks when we saw that the predicted install of 2 floors a week was achievable.

By the end of the Wooden Structural phase of the project the construction team was able to install 16 floors in 9 weeks. A very satisfying result from planning and execution. The Preston Superdeck [System] was the perfect choice of equipment and played an integral part of the success of the Brock Commons Tall Wood project.”

Bill Leininger, Superintendent

Urban One Builders Construction Management Inc

09/04/2025

Play Free Slots: Appreciate Casino Site Gamings without Spending a Penny

Fruit machine are a prominent type of entertainment in casinos worldwide. With their flashing lights, exciting sounds, and the adventure of the unknown, they provide hours […]
09/04/2025

Best Casino Games Casinos online offer a variety of games from top providers. Certain games are more notable than others. These games are popular because of […]
09/03/2025

Ideal Ranked Online Casinos: A Comprehensive Overview

On-line online casinos have obtained remarkable appeal in the last few years, using gamers a hassle-free method to appreciate their preferred gambling enterprise games from the […]